Jaguar
Jaguar Operation
- Jaguar is located 300km north of Kalgoorlie, WA
- Jaguar plant operating at above nameplate capacity
- Annual production expected to exceed Bankable Feasibility Studies
- Underground development ahead of schedule
Jabiru was floated as a public company in 2000 to develop the remnant VMS resources of the old Teutonic Bore mine (mined 1980-1985). A joint venture was entered into with Inmet over the Teutonic Bore lease area which resulted in the discovery the Jaguar VMS resource 4 kilometres south of Teutonic Bore in 2002. Inmet drilled Jaguar to resource status and Jabiru subsequently negotiated to take 100% ownership of both Jaguar and the exploration Joint Venture in 2004, which then enabled Jabiru to take Jaguar through to development and into production in its’ own right.
Jaguar Operation summary
The Jaguar Operation comprised an underground mine, a conventional grinding and flotation processing plant with an 450,000 tpa capacity, a permanent village, gas fired power station line and bore field fileds.
Jaguar concentrates are trucked to the