| Property | Value |
| Name | Jaguar High Grade Drill Results |
| Description |
The Directors of Jabiru Metals Limited (formerly Pilbara Mines Limited) are pleased to report on
follow-up drilling of the massive sulphide mineralisation intersected at the Jaguar Project previously
reported on 5 August 2004 and to provide definition of a new upgraded resource model for the
Bankable Feasibility Study.
|
| Filename | ASX_JML_6Sept2004.pdf |
| Filesize | 151.25 kB |
| Filetype | pdf (Mime Type: application/pdf) |
| Creator | alpena |
| Created On: | 09/06/2004 13:47 |
| Viewers | Everybody |
| Maintained by | Everybody |
| Hits | 1342 Hits |
| Last updated on | 07/21/2009 18:20 |
| Homepage | |
| CRC Checksum | |
| MD5 Checksum |








